Please respect roadworks, says Latvian road authority

Currently, 71 sections of the national road network are under construction and many have reversing traffic controlled by traffic lights. The state enterprise "Latvian State Roads/Latvijas Valsts ceļi" (LVC) asks the public to observe the temporary traffic lights.

There are seven temporary traffic lights on the Vidzeme motorway (A2) from the turn-off to Cēsis (P20) to Rīdzene. There, drivers have been recorded driving through red traffic lights, breaking traffic rules, and endangering road safety, as well as the safety of those working on the construction site.

When offenders enter a reversing zone where two vehicles can't pass each other, it can cause even more congestion, LVC said. In addition, road construction workers and heavy machinery are working in the construction zone. Violating traffic lights endangers the safety of workers, and drivers endanger their own safety and that of their fellow passengers.

Information on all construction sections and restrictions is available on the construction map on the website of Latvijas Valsts ceļi (LVC). Please consult the map of the roadworks and plan extra travel time in case you have to cross the repair sections.

Major traffic restrictions on main national roads:

  • Vidzeme highway (A2) from the turn-off to Cēsis (P20) to Rīdzene - six traffic lights, speed limits 70 and 50 km/h. Estimated crossing time 45 minutes;
  • Jelgava highway (A8) from Jaunolaine to Rīga, speed limit 70 and 50 km/h, estimated crossing time 45 minutes;
  • Jelgava highway (A8) from Dalbe to the bridge over the Vircava river, speed limit 70 and 50 km/h, up to three traffic lights, estimated crossing time 40 minutes.
Seen a mistake?

Select text and press Ctrl+Enter to send a suggested correction to the editor

Select text and press Report a mistake to send a suggested correction to the editor

Related articles

More

Most important