Rīga HPP bridge to be closed temporarily

In order to relocate a transformer, traffic on the Rīga HPP (Rīgas HES) bridge will be temporarily closed next Wednesday, May 29, Latvenergo said.

Traffic on the Riga HPP bridge in the section from Salaspils roundabout to Daugmale roundabout will be closed between May 29 20:00 and May 30 at 5:00.

Road users should use the Dienvidu Bridge and/or the Ķegums HPP Bridge to get around.  

Residents of Dole Island and Zirņu Island will be able to get there by coordinating with traffic controllers. 

For residents of Dole Island, access is possible from the left bank of the Daugava River (from Ķekava, Daugmale) by informing the traffic controller (on the roundabout). For residents of Zirņu Island, access is from the Daugava right bank roundabout (from Salaspils).

Warning signs and the planned traffic restriction scheme have been posted.

Seen a mistake?

Select text and press Ctrl+Enter to send a suggested correction to the editor

Select text and press Report a mistake to send a suggested correction to the editor

Related articles

More

Most important